A highway leading from the Andalib Avenue to the Ahalteke Equestrian Complex of the President of Turkmenistan was reconstructed and put into operation on the eve of the Turkmen Horse Day. The project was implemented by jointly the specialists of the Turkmenavtoyollary State Concern and Vozrozhdenie Production Association (Russian Federation), who have great experience in implementing large-scale projects, including construction of highways, interchanges and bridges.
The total length of the road with two traffic lanes is 4.5 kilometers. The road satisfies the requirements set to facilities of this type. There are modern bus stops and car parking supplied with necessary equipment on the road covered with nine layers.
The total length of the road with two traffic lanes is 4.5 kilometers. The road satisfies the requirements set to facilities of this type. There are modern bus stops and car parking supplied with necessary equipment on the road covered with nine layers.