Turkmenbashi oil refineries is to conclude and finance the contract with General Electric International Inc. (US) for the monitoring of high temperature gas transportation networks and capital repair of the gas turbine power plant and the purchase of spare parts for the gas turbine power plant.
The services are to be performed in accordance with the Special Resolution of the President of Turkmenistan and the Oil and Gas Industry Development Programme of Turkmenistan for the period till 2030.
The services are to be performed in accordance with the Special Resolution of the President of Turkmenistan and the Oil and Gas Industry Development Programme of Turkmenistan for the period till 2030.