Ï “Woods” of drilling rigs are growing
mail-icon
altynasyr.newspaper@sanly.tm
EN RU TK

“Woods” of drilling rigs are growing

view-icon 1423
“Flow rate of new well # 1758 at Eastern Goturdepe deposit is 50 tons of oil per day” – such information came to the oil and gas production management “Goturdepenebit”. Commercial inflow of “black gold” was obtained from depth of 2503 meters although the total depth of this well – 2600 meters.

Another new well # 1768 also provides the same volume of oil per day. It was put into exploitation by crew of Goturdepe management of drilling works. Here, the commercial oil inflow was obtained from depth of 1600 meters that testifies about availability of rich beds not only in deep stratum but also on surface structures of this deposit.

These are only the last two wells commissioned by miners. Within the first six months, seven producing wells were put into exploitation at the deposit. For this period of the current year, the drillers of Nebitdag management of drilling works of “Turkmennebit” State Concern overfulfilled the plan by one well. “Geography” of exploratory works is expanded and at that, “woods” of drilling rigs expand their borders in Nebitdag, Garadashli, Ordekli deposits as well.

So, drilling of well # 938 has been completed recently. Already at depth of 1327 meters, the daily flow rate of this well came to 40-50 tons of “black gold” that testifies about productivity of underground stowage of Nebitdag deposit, which fully justify its name “oil hill”.

Boring operations have been completed in well # 88 of Ordekli deposit and presently, it is carried out the consolidating, starting-up and adjustment works. In well # 7 of Garadashli deposit, which total depth is 4800 meters, the works are going on and in the near future, oil “fountain” will gush here as well.