High indices of the boring crews, developing new deposits, - result of harmonious work of production workers, scientists-geologists of Institute “Nebitgazylmytaslama” of “Turkmennebit” SC, field geologists, geophysicists and specialists of other directions participating in development of oil resources of seaside land.
Already within more than five years, oil industry workers carry out the works on shoal of the Caspian Sea - in Northern Goturdepe. Presently, the Management of Goturdepe Drilling Operations conducts at a rapid pace the drilling of 5 prospecting and 10 operational wells.
Today, at Altyn-kui deposit located in Esenguly etrap, the drilling works are realized simultaneously in three prospecting and 11 operational wells.
It is worth mentioning that if earlier the operational drilling in Northern Goturdepe and in Altyn-kui was realized jointly with the foreign companies, then now, it is conducted by forces of Turkmen specialists. Enterprises of “Turkmennebit” SC are provided with advanced up-to-date equipment intended for conducting the drilling works in ultradeep wells. And it, in turn, promotes the performance of tasks in view.
The strategic natural resources, providing energy and economic independence of Turkmenistan, are oil and gas. For the purpose of increase the production of these natural resources, it was worked out the National Program of Oil and Gas Complex Development of Turkmenistan until 2030. According to it, before the branch, in particular, it was set a task to accelerate the development of new oil deposits, to raise efficiency of operational and return of oil layers, in a complex to mechanize and automate the extraction of hydrocarbon raw materials.
Already within more than five years, oil industry workers carry out the works on shoal of the Caspian Sea - in Northern Goturdepe. Presently, the Management of Goturdepe Drilling Operations conducts at a rapid pace the drilling of 5 prospecting and 10 operational wells.
Today, at Altyn-kui deposit located in Esenguly etrap, the drilling works are realized simultaneously in three prospecting and 11 operational wells.
It is worth mentioning that if earlier the operational drilling in Northern Goturdepe and in Altyn-kui was realized jointly with the foreign companies, then now, it is conducted by forces of Turkmen specialists. Enterprises of “Turkmennebit” SC are provided with advanced up-to-date equipment intended for conducting the drilling works in ultradeep wells. And it, in turn, promotes the performance of tasks in view.
The strategic natural resources, providing energy and economic independence of Turkmenistan, are oil and gas. For the purpose of increase the production of these natural resources, it was worked out the National Program of Oil and Gas Complex Development of Turkmenistan until 2030. According to it, before the branch, in particular, it was set a task to accelerate the development of new oil deposits, to raise efficiency of operational and return of oil layers, in a complex to mechanize and automate the extraction of hydrocarbon raw materials.