Ï Avaza prepares for opening of a regular high-rise hotel
mail-icon
altynasyr.newspaper@sanly.tm
EN RU TK

Avaza prepares for opening of a regular high-rise hotel

view-icon 1229
A regular wave of building boom has captured the National Tourist Zone “Avaza”. Today, 25 socio-cultural facilities, 17 of which - on territory of a sea resort are constructed in Avaza etrap of Turkmenbashi city. The most part of new buildings comprise the complexes of the cultural-entertaining centers, as well as five high-class hotels. It is particularly worth mentioning the 12-storeyed hotel for 300 places, being erected to the order of Ashgabat city municipality.

On the site allocated under construction in 55 thousand square meters, it was completed the basic construction and machine-assembling works. Inside of the construction site, it is expanded the front of finishing and technical works. Premises for the automated life-support systems of a hotel complex are equipped. Besides the diesel engine-generator, transformer substation, boiler with pump and reservoir park of fresh water, their structure includes salt water distiller.

Other sub-objects of the capital recreational zone on the coast of Caspian Sea have also got the finished form. Near swimming pool with the size 25 to 12 meters, aqua park and children’s small pool, it is established water attractions. From the seaside, the summer bar and cafe, tennis court, basketball and children's playgrounds are constructed. Summer arbors and decorative sun-protection awnings are located in convenient places.

From hotel it was laid a direct alley to a pier for sea walks on motor, sailing and rowing boats. In halfway to a mooring, in a beach zone, it was constructed the summer pavilion, where the visitors will enjoy cooling and energy drinks. Nearby, it was accomplished a ground for beach football.


In the hotel, a brigade of sanitary technicians, electricians, assemblers, dressers have started a finishing stage of works. In ground floor of a building, it is completed the works in premises of cultural-entertaining, and also technical and office appointment. Among them, the most considerable in the sizes are the reception hall, nightclub, game hall, multipurpose SPA-salon and swimming pool. According to design norms, it is finished the medical, massage and other rooms of restorative -preventive medicine.

On the first floor, it is completed the works in a lobby with the area about 300 square meters and comparable to it on the sizes three lobbies-bars, a conference hall for 200 seats, administrative office, fitness gym, as well as in full-format cinema hall and restaurant occupying, accordingly, 757 and 556 square meters. Final changes are brought in interiors lift halls, a banquet room, gift shop, bowling, hairdresser's salons, exchange office and other premises of service and office appointment. Hotel rooms in the residential block of hotel are made out under the European standards of the hotel industry.

The bold space-and-planning decisions taken as a principle of the project were vividly reflected in the magnificent hotel complex, differing by a harmonious combination of forms of modern architectural art and traditional Turkmen architecture.

Original composite schemes attach to a high-rise building unusual expressiveness and artistic plasticity, altering the shape of hotel depending on a point of the review of the chosen foreshortening, illumination and distance. From three sides, the residential “towers” of white-marbled hotel remind sails of sport yachts, and in the prospect of frontal facade - nemes - a headdress of Pharaohs and mysterious Sphinx.

And certainly, such hotel does not remain unnoticed and will attract the attention of numerous tourists, which stream increases in “Avaza” year by year, including in the period of “velvet” season. For this time, it is planned to put the project into operation.